mirror of
https://github.com/ckaczor/azuredatastudio.git
synced 2026-01-14 09:59:47 -05:00
* Fix project context menu actions (#12541) * delete works again * make fewer changes * update all sql db project commands * cleanup * Remove old projects view (#12563) * remove old projects view from file explorer view * fix tests failing * remove projects in open folder opening up in old view * Update db reference dialog to show projects in the workspace (#12580) * update database reference dialog to show projects in the workspace in the project dropdown * remove workspace stuff from sql projects extension * undo change * add class that implements IExtension * undo a change * update DataWorkspaceExtension to take workspaceService as a parameter * add type * Update sql database project commands (#12595) * remove sql proj's open and create new project from comman palette * hook up create project from database to data workspace * rename the remaining import databases to create project from database * remove open, new, and close commands * expose addProjectsToWorkspace() in IExtension instead of calling command * Addressing comments * fix failing sql project tests (#12651) * update SSDT projects opened in projects viewlet (#12669) * fix action not refreshing the tree issue (#12692) * fix adding project references in new projects viewlet (#12688) * Remove old projects tree provider (#12702) * Remove old projects tree provider and fix tests * formatting * update refreshProjectsTree() to accept workspaceTreeItem() * Cleanup ProjectsController (#12718) * remove openProject from ProjectController and some cleanup * rename * add project and open project dialogs (#12729) * empty dialogs * wip * new project dialog implementation * revert gitattributes * open project dialog * implement add project * remove icon helper * refactor * revert script change * adjust views * more updates * make data-workspace a builtin extension * show the view only when project provider is detected (#12819) * only show the view when proj provider is available * update * fix sql project tests after merge (#12793) * Update dialogs to be closer to mockups (#12879) * small UI changes to dialogs * center radio card group text * Create workspace if needed when opening/new project (#12930) * empty dialogs * wip * new project dialog implementation * revert gitattributes * open project dialog * implement add project * remove icon helper * refactor * revert script change * create workspace * initial changes * create new workspace working * fix tests * cleanup * remove showWorkspaceRequiredNotification() * Add test for no workspace open * update blue buttons * move loading temp project to activate() instead of workspaceService constructor * move workspace creation warning message to before project is created * pass uri to createWorkspace * add tests Co-authored-by: Alan Ren <alanren@microsoft.com> * Additional create workspace changes (#13004) * Dialogs workspace updates (#13010) * adding workspace text boxes * match new project dialog to mockups * Add validation error message for workspace file * add enterWorkspace api * add warning message for opening workspace * cleanup * update commands to remove project so they're more generic * remove 'empty' from string * Move default project location setting to data workspace extension (#13022) * remove project location setting and notification from sql database projects extension * add default project location setting to data workspace extension * fix typo * Add back project name incrementing * other merge fixes * fix strings from other PR * default to last opened directory instead of home directory if no specified default location * A few small updates (#13092) * fix build error * update title for inputboxes * add missing file * Add tests for data workspace dialogs (#13324) * add tests for dialogs * create helper functions * New project dialog workspace inputbox fixes (#13407) * workspace inputbox fixes * fix folder icons * Update package.jsons and readme (#13451) * update package.jsons * update readme * add workspace information to open existing dialog (#13455) Co-authored-by: Alan Ren <alanren@microsoft.com>
1.5 KiB
1.5 KiB
Microsoft SQL Server Database Projects for Azure Data Studio
Microsoft SQL Server Database Projects for Azure Data Studio includes:
Database Projects
The Database Projects extension provides a way to design, edit, and publish schemas for SQL databases from a source controlled project.
Please report issues and feature requests here.
Getting Started with Database Projects
- Create a new database project by going to the Projects viewlet or by searching Projects: New in the command palette.
- Existing database projects can be opened by going to the Projects viewlet or by searching Projects: Open Existing in the command palette.
- Start from an existing database by using Create Project From Database from the command palette or database context menu.
Code of Conduct
This project has adopted the Microsoft Open Source Code of Conduct. For more information see the Code of Conduct FAQ or contact opencode@microsoft.com with any additional questions or comments.
Privacy Statement
The Microsoft Enterprise and Developer Privacy Statement describes the privacy statement of this software.
License
Copyright (c) Microsoft Corporation. All rights reserved.
Licensed under the Source EULA.